Hot Line:+86-539-2650656、2650658

Welcome to en.sdgangquan.com!

Contact us

ADD:Mengyin County, Shandong Province, China

TEL:+86-539-2650656 / 2650658

FAX:+86-539-2650652

Nav

Follow us

Mobile website

WeChat

Copyright ©  Shandong Engineering Machinery Steel Rim Co., Ltd. All Rights Reserved |  鲁ICP备11019815号  |  Powered by 300.cn

NEWS CENTER

The three-party audit of Huawei Heavy Industry and Shangong Steel Circle passed successfully

Classification:
Company News
Author:
Source:
Release time:
2018/11/07
Page view
[Abstract]:
From May 15th to 16th, Huaxia Certification Center Co., Ltd. launched a two-day management system audit around the OEM products

  From May 15th to 16th, Huaxia Certification Center Co., Ltd. launched a two-day management system audit around the OEM products produced by Huawei Heavy Industries. From May 19 to May 21, Shenzhen Huamao International Certification Co., Ltd. conducted a three-day management system review of the rim module with engineering machinery parts modules. During the audit process, all departments actively cooperated to ensure that the audit was successful within the specified time. by. After five days of review, the rework module audit teacher issued 8 non-conformities and 15 observation items. The steel ring module issued 4 non-conformities and 2 observation items; the non-conformities were mainly concentrated on: inspection/operation No standards or standards are inconsistent with actual implementation; some suppliers are not in control; special equipment is not timely implemented for periodic inspection, special positions are not timely certified for replacement; records are not marked or missing records; problems are not effectively closed with PDCA ; document management is not in place; internal audit leakage clause. In response to the problems found, each department is required to first close the non-conformities, and secondly, to develop corresponding improvement measures for the observations. The non-conformity requirements are effectively closed within 20 days, and the non-conformity and observing items of the closing management representative must rise to the management level. Through this third-party audit, not only can the problems that are easily overlooked in our daily work be exposed, It can expose the weak points or management misunderstandings of our management process. Through the review process and the communication with the auditors at the last meeting, the teacher not only pointed out the problems for us but also helped us to clarify the ideas. I hope that through this review, our management ability. Can go up a step.

News

Safety production system inspection
Safety production system inspection
Abstract:
On May 8th, the County Safety Supervision Bureau and the Economic Development Zone Safety Supervision Office hired provincial experts to make
Warriors at high temperatures
Warriors at high temperatures
Abstract:
In order to meet the customers' day and night production, the rim of the painting line appeared on the afternoon of May 29th,
Excellent team
Excellent team
2018-11-07
Abstract:
The rim workshop finishing line has a total of 14 members, including 3 female employees. They are a team that is hardworking, hardworking,
18-year-old company awards in March, April and May
18-year-old company awards in March, April and May
Abstract:
In order to complete the work targets set in the past 18 years, on the occasion of the peak season of production in March, April and May,
Shandong Haiwo Construction Machinery Co., Ltd. / Shandong Engineering Machinery Steel Ring Factory Co., Ltd.
Shandong Haiwo Construction Machinery Co., Ltd. / Shandong Engineering Machinery Steel Ring Factory Co., Ltd.
Abstract:
Shandong Haiwo Construction Machinery Co., Ltd. is controlled by Shandong Engineering Machinery Steel Ring Factory Co., Ltd.,
Page up
1
2
3